🇺🇦 UA 🇬🇧 EN
Authorization
Login
Password
Registration
Search
 




Vote
What yarn do you use most often?
YarnArt
ALIZE
NAKO
Trinity
Kartopu
Pekhorskaya
Semyonovskaya
Other

Blue sweater and cap

Added:             Views: 58614

Blue sweater and caphttp://klubok.work/1/3/4528/Klubok










Size: 38

You will need: 700 g for the pullover and 100 g for the hat of blue yarn Mondial Merino Plus (52% merino wool, 48% acrylic, 125 m/100 g) straight and auxiliary NEEDLES N5; hook No. 5; darning needle

PULLOVER

To get a garment one size larger/smaller than specified, you need to add/subtract 2 cm (3 sts. of stockinette stitch for the back and the corresponding number of stitches and rows for the front) in width and 2 cm (4 rows) in length.

Double rib: cast on half of the required stitches with contrasting yarn. 1st row: with working yarn knit *1 knit, 1 yarn over*, repeat from * to *. 2nd row: *knit the yarn over, slip 1 st as purl, without knitting, yarn in front *, repeat from * to *. 3rd and subsequent rows: *1 knit, slip 1 st as purl, yarn in front*, repeat from * to *; in the finished piece unravel the contrasting yarn.

Rib 1/1: alternate 1 knit, 1 purl.

Stockinette stitch: knit rows - knit sts., purl rows - purl sts.

Purl stitch: knit rows - purl sts., purl rows - knit sts.

Purl stitch with "bobbles", lace leaves and braids A: knit according to scheme 1 in even rows knit all stitches according to the pattern.

Braid pattern B: knit according to scheme 2.

"Bobble": into one stitch knit 1 knit, 1 purl, 1 knit, 1 purl, 1 knit, turn the work, 5 purls, turn, 5 knits, turn, 5 purls, turn, 1 pass (slip 1 st as knit, 4 sts. together knit and pull this stitch through the slipped one).

as knit, 4 sts. together knit and pull this stitch through the slipped one).

Rose and leaves: crochet according to the respective schemes

Fantasy_pattern and fan_pattern crochet according to schemes 3 and 4.

Open fan: 7 dc in one base stitch.

Closed fan: 7 dc worked together in one base stitch.

Knitting density. Stockinette stitch: 14 sts. and 18 rows = 10 x 10 cm; leaf pattern: 13 sts. = 9 cm; braid A: 13 sts. = 9 cm; grid: 14 sts. = 7 cm; braid B: 17 sts. = 10 cm.

Back: cast on 65 sts. and knit 4 rows in double rib and 2 rows in rib 1/1 (a total of 2 cm). Then knit in stockinette stitch, after 37 cm from the rib for the armhole slopes, close 3 sts. on both sides once, and then decrease 1 st on both sides after the first and before the last stitches every 2nd row. 2 times 1 st. (on the right side knit 2 sts. together by passing: slip 1 st as knit, 1 knit and pull it through the slipped stitch, on the left knit 2 sts. together knit). After 20 cm from the beginning of the armhole slopes, set aside the remaining 55 sts.

Front. Part 1: cast on 67 sts. and knit rib as for the back. Then knit according to scheme_4 in purl stitch with "bobbles", lace leaves and braids A. Following the scheme, decrease between the purl stitches with "bobbles" every 2nd row 38 times 1 st. (on the right side for the first 35 decreases knit 2 sts. together purl before the last stitch of the purl stitch with "bobbles", for the remaining decreases knit the last 2 purl stitches together purl). Simultaneously, starting from the 3rd row, increase on the left every 2nd row 8 times 1 st., as indicated on the scheme. After 30 cm from the rib, close 17 sts. on the left once. After 37 cm (68 rows) from the rib for the armhole slope close 4 sts. on the right once and then decrease after the first stitch every 2nd row 2 times 1 st. (on the right side knit 2 sts. together purl). After 6 cm (10 rows) from the beginning of the armhole slope decrease 1 st. on the left once (to the left of the leaf pattern instead of a simple pass, do a double: slip 1 st. as knit, knit 2 sts. together knit and pull this stitch through the slipped one). After 7 cm (12 rows) from the beginning of the armhole slope close 6 times 1 st. on the right every 2nd row. After 10 cm (18 rows) from the beginning of the armhole slope close 3 times 1 st. on the left every 2nd row. (simultaneously with the closing of the 2nd st. make an increase in the center by doing a yarn over). After 13 cm from the beginning of the armhole slope, work the 3 middle stitches with a double pass, knit 2 rows and close the remaining 3 sts.

Part 2: cast on 14 sts. and knit the grid according to scheme_2. After 4 cm for the armhole slope, re-cast 21 sts. and knit on the newly cast stitches with braids B. After 24 cm (44 rows) from the cast edge, decrease on the right after the first stitch every 2nd row 10 times 2 sts. (on the right side for the first decrease knit 3 sts. together knit, for the remaining decreases knit 3 sts. together with a double pass) and 4 times 3 sts. (on the right side knit 4 sts. together with a triple pass). After 40 cm (72 rows) from the cast edge

close the remaining 3 sts.

Part 3: crochet a chain of 35 ch; 1st row: 1 dc in the 6th ch from the hook, 1 dc in the next 5 sts., * 1 ch, skip 1 st. of the base row, 1 sc in the next 2 sts., 1 ch, skip 1 st. of the base row, 1 dc in the next 7 sts.*. repeat from * to * 2 times, 1 ch, skip 1 st. of the base row, 1 sc in the last 2 sts. of the row. Then knit according to scheme_3 decreasing on the left in every row 7 times 1 st., knit 2 rows and decrease in every row 2 times 1 st.; on the right in every row 5 times 1 st., knit 4 rows and decrease in every row 3 times 1 st., knit 2 rows and decrease 1 time 1 st. After 13 cm from the cast edge set aside the work.

Part 4: insert the hook at point A of part 2 and knit the fan pattern according to scheme_4 making the corresponding decreases for the neck cut; after the 4th row, cut and secure the yarn. Connect parts 2 and 1 along lines BC and SO. On needles cast on 20 sts. along line OC of part 2 and knit according to scheme_5 in purl stitch with "bobbles", increasing on the right after the first stitch in every 2nd row 5 times 1 st. (on the right side knit 1 purl crossed from the transverse yarn) and simultaneously decreasing on the left before the last 2 sts. in every 4th row 4 times 1 st. (on the right side knit 2 sts. together purl). After 6 cm from the beginning of the part, set aside the remaining 21 sts. Connect the right edge of the newly knitted part with line OE of part 1. Connect the slanted edges of part 3 with parts 1 and 2.

Sleeves: cast on 31 sts. and knit rib, as for the back. Then knit in stockinette stitch, increasing on both sides after the first 2 and before the last 2 stitches in every 8th row 9 times 1 st. (on the right side knit 1 knit crossed from the transverse yarn). After 46 cm from the rib for the armhole close 3 sts. on both sides once and then decrease after the first and before the last stitches in every 2nd row 8 times 1 st. (on the right side knit 2 sts. together by passing, on the left knit 2 sts. together knit). After 10 cm from the beginning of the armhole set aside the remaining 27 sts.

Assembly: connect the knit stitch of the left shoulder stitches of the front with the corresponding stitches of the back. For the collar, cast on 68 sts. along the neckline, knitting the set-aside stitches knit, knit 3 6 rows in purl stitch, evenly increasing in the 8th row 1 time 16 sts. and in the 16th row 1 time 16 sts. (on the right side knit 1 purl crossed from the transverse yarn), and 6 rows in double rib (a total of 22 cm); close all stitches with knit stitch. Make the collar seam 19 cm from the top edge on the right side, then on the wrong side; connect the knit stitch of the set-aside stitches of the right shoulder of the back with the stitches of the last row of the fan pattern. Make side seams, sleeve seams and set in the sleeves. Knit 3 roses and 5 leaves and sew 1 rose and 2 leaves at the bottom of the lace leaf strip, 2 roses and 3 leaves at the bottom of the right side of the front, knitted in purl stitch. In the center of each leaf, embroider the veins with a chain stitch.

HAT

Double rib: as for the pullover.

Grid (16 sts.): knit according to scheme_6 in even rows knit all stitches according to the pattern. 11th row: repeat the report of the 3rd row.

Fan pattern (number of stitches multiple of 24): knit according to scheme_7 Open fan: the number of dc specified in the scheme in one base stitch Closed fan: the number of dc specified in the scheme, worked together, in one base stitch.

Knitting density. Grid: 16 sts. = 8 cm; fan pattern: 16 sts. and 5 rows = 10 x 10 cm.

Work description: cast on 19 sts. and knit 3 sts. in double rib, 16 sts. in grid. After 53 cm (96 rows) set aside all stitches. Connect the set-aside stitches with the stitches of the cast-on row using the knit stitch. Crochet 1 row of slip stitches on the side opposite to the double rib, and then knit the fan pattern according to scheme_7 (12 open fans in the first row). Starting from the 3rd row of the pattern, decrease in each row 3 times 1 st. in each motif. In the 6th row alternate closed fans of 8 and 5 dc so that there are a total of 8 fans. In the 7th row decrease stitches according to the scheme, at the end of the row cut the yarn, leaving a long tail. Pull the yarn through the last row stitches and gather.


 







Also in this category: