Топ спицами
Добавлено: 24.09.2025 в 17:07 Просмотров: 268
Топ спицамиKlubokhttp://klubok.work/1/82/9165/Klubokhttps://klubok.work/css/image/top-logo-en.png
Sizes: S - M - L - XL - XXL - XXXL
Materials:
DROPS COTTON LIGHT from Garnstudio (belongs to yarn group B)
300-300-350-350-400-450 g colour 08, ice blue
DROPS DOUBLE POINTED NEEDLES AND CIRCULAR NEEDLE (40 + 60 or 80 cm) SIZE 4 MM – or the size needed to get 21 stitches and 28 rows stocking stitch or 17 stitches and 28 rows lace pattern on 10 cm in width and 10 cm in height.
PATTERN:
See diagrams A.1 to A.8. See arrow for your size in A.1 and A.4.
TOP:
The top is worked in the round with circular needle, top down. Increase to raglan, the increases are shown in diagrams A.1 and A.3.
Cast on 132 stitches in all sizes with circular needle size 4 mm and Cotton Light. Work 2 RIDGES – see description above, then knit 1 round. Continue working as follows: * A.1 (= 5 stitches), A.2 (= 21 stitches), A.3 (= 7 stitches) *, work from *-* 4 times in total. The first repeat of A.1, A.2 and A.3 = the back piece, the second repeat of A.1, A.2 and A.3 = the sleeve, the third repeat of A.1, A.2 and A.3 = the front piece and the fourth repeat of A.1, A.2 and A.3 = the sleeve. REMEMBER THE KNITTING TENSION! Continue this pattern until there are 3 rounds left before the round with the arrow – see the arrow for your size! Work as before over the first and then the third repeat of A.1, A.2 and A.3. Over the second and the fourth repeat of A.1, A.2 and A.3 work the next 3 rounds as follows: purl over all stitches, knit over all stitches, purl over all stitches, but continue the increases as in A.1 and A.3. The next round is worked as follows (= the round with the arrow): work the first 55-59-63-67-75-79 stitches (= the back piece) cast off the next 55-59-63-67-75-79 stitches (= second repeat of A.1, A.2 and A.3), work the next 55-59-63-67-75-79 stitches (= the front piece), cast off the last 55-59-63-67-75-79 stitches (= the fourth repeat of A.1, A.2 and A.3).
BODY:
READ THE WHOLE OF THE FOLLOWING DESCRIPTION BEFORE CONTINUING! THE PIECE IS NOW MEASURED FROM HERE!
Continue as follows – start on the round with the arrow for your size: * Work A.4 (= 16-19-20-23-27-28 stitches), A.5 (= 22-20-22-20-20-22 stitches), A.6 (= 17-20-21-24-28-29 stitches), cast on 14-14-20-22-26-30 new stitches *, work from *-* 2 times = 138-146-166-178-202-218 stitches. Work 2 ridges over the new 14-14-20-22-26-30 stitches in each side, continue the pattern over the other stitches as before. NOTE! no stitches are decreased in diagrams A.4, A.5 and A.6. The number of stitches in stocking stitch between the front and back pieces increases while the number of stitches in A.4, A.5 and A.6 decreases. When you have worked 2 ridges over the new stitches, work A.7 over the middle 6 stitches in each side. The increased stitches in A.7 are worked in stocking stitch = 4 increased stitches every 8th round. When A.4, A.5 and A.6 have been worked 1 time in height continue with A.8 over these stitches.
When A.8 is finished in height continue working with stocking stitch over the stitches on the front piece and the back piece, continue with the pattern and increases in A.7 as before. Continue until the piece measures 41-42-43-43-43-43 cm, there are now approx. 190-206-222-238-258-278 stitches on the round. Work 2 ridges over all the stitches, then cast off. The piece measures in total 58-60-62-64-66-68 cm from the shoulder.
Diagram




