Airy cardigan knitting
Added: 17.07.2025 в 20:26 Views: 482
Airy cardigan knittingKlubokhttp://klubok.work/1/2/8908/Klubokhttps://klubok.work/css/image/top-logo-en.pngYarn: Vittorio (mohair on silk)
Consumption: 100 g
Needles: No. 5 on a cable
Technique: knitting fabric across, in 2 threads
Process Description
The fabric is knitted entirely from sleeve to sleeve. All calculations are based on the pattern rapport and the provided diagram.
Step 1: First Sleeve
-
Cast on 62 stitches = 4 rapports + 2 edge stitches.
-
Knit 4 rapports in height (vertically).
Step 2: Expanding to the Body
-
Cast on an additional 31 stitches on each side of the fabric.
-
Total number of stitches = 124 stitches = 8 rapports in width.
-
Knit 1 rapport in height — this will be the area under the bust/neckline.
Step 3: Shaping the Neckline
-
Divide all stitches in half — you will have 62 stitches each.
-
Knit each half separately, knitting 8 rapports in height.
Step 4: Joining and Finishing
-
Reconnect the stitches of both halves.
-
Knit 1 rapport in height.
-
Bind off 31 stitches at each edge — this is the shoulder line.
-
You will have the stitches of the second sleeve left (62 st.) — knit another 4 rapports in height.
-
Bind off all stitches.
Assembly and Finishing
-
Sew the sides with a hook.
-
Crochet around the sleeves, forming cuffs.
-
Wash gently, dry flat — and enjoy the incredible softness and lightness of mohair











